Installation and commissioning

Areas of implementation

Blockage of dosing tracts (30003, 30013, 30005) at Pellets Production Workshop (TsVO)

Pellets Production Workshop. Construction of the filtering and averaging of concentrate No. 1 housin...

Pellets Production Workshop. Construction of a new press filtration complex

Construction of a complex for filtration and storage of iron ore concentrate of the crushing and ben...

Replacement of the furnace drive at Pellets Production Workshop (TsVO) 3rd technological line

Electrical installation work (sections EM, 3, 4 and ATX 1, 3, 4) during installation of the BENZLERS...

Pellets Production Workshop (TsVO). Modernization of ACS TP of the 2nd technological line

Technical re-equipment of DZF belt conveyor No. 2 drives

Technical re-equipment of DZF belt conveyor No. 7 drives

Technical re-equipment of DZF belt conveyor drives No. 6

Replacement of the Pellets Production Workshop (TsVO) furnace drive at 2nd technological line

Development of a working project for the replacement of stationary control posts (PU) No. 6, 8, 9 of...

Installation of automatic transfer switches for drainage pumps of the 10th section of the DMP

Relocation of the operator control room SDS-1 DOF

Reconstruction of the electrical equipment of the CO-2 stacker at the Pellets Production Workshop (T...

Installation of screw conveyors (conveyor closers) at the 2nd technological line of the Centralized ...

Replacement of DC drives with AC drives with frequency regulation of the centralized control center

Replacement of the Pellets Production Workshop 1 (TsVO-1) furnace drive at 1st technological line

Technical re-equipment of the oil product analysis laboratory

Installation the lamps on columns along the crane routes of building 1 (Centralized Crane Shop)

Crushing and processing plant (DZF). Construction of new SMD-1 tracts. Transfer of the ZF operator room

Crushing and processing plant (DZF). Reconstruction of blowers at the flotation site of OPU-4

Right Menu Icon