Replacement of the furnace drive at Pellets Production Workshop (TsVO) 3rd technological line

CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2020
TYPE OF WORKS
Installation and commissioning

Equipment used, specifics of works provided

  1. The reconstruction works were completed within the tight timeframe of the scheduled furnace repair.
  2. The project included the replacement of a high-voltage drive switchgear consisting of a high-voltage dry transformer, an input cells, a DC switchgear, power and control cables.
  3. The complexity of the work was due to the large overall dimensions of the equipment, which required rather complicated construction work and design solutions to enable the heavy equipment to be lifted to +16 meters in the conditions of the operating workshop.
  4. The commissioning works were performed in the extreme modes of the furnace start-up.

Installation works
Commissioning works