Development of a working project for the replacement of stationary control posts (PU) No. 6, 8, 9 of mills 800, 650 of the large-grade rolling shop with modular ones
CLIENT
PJSC "MK "Azovstal"
YEARS OF IMPLEMENTATION
2018—2019
TYPE OF WORKS
Design, supply of equipment, installation works
Equipment used, specifics of works provided
- Dismantling and installation work was completed in 15 days during the rolling mill shutdown.
Design
Equipment supply
Installation works
Similar projects
Blockage of dosing tracts (30003, 30013, 30005) at Pellets Production Workshop (TsVO)
Construction of a complex for filtration and storage of iron ore concentrate of the crushing and ben...
Crushing and processing plant (DZF). Construction of new SMD-1 tracts. Transfer of the ZF operator room
Crushing and processing plant (DZF). Reconstruction of blowers at the flotation site of OPU-4
Electrical installation work (sections EM, 3, 4 and ATX 1, 3, 4) during installation of the BENZLERS...
Installation of automatic transfer switches for drainage pumps of the 10th section of the DMP
Installation of screw conveyors (conveyor closers) at the 2nd technological line of the Centralized ...
Installation the lamps on columns along the crane routes of building 1 (Centralized Crane Shop)
Pellets Production Workshop (TsVO). Modernization of ACS TP of the 2nd technological line
Pellets Production Workshop. Construction of a new press filtration complex
Pellets Production Workshop. Construction of the filtering and averaging of concentrate No. 1 housin...
Reconstruction of the electrical equipment of the CO-2 stacker at the Pellets Production Workshop (T...
Relocation of the operator control room SDS-1 DOF
Replacement of DC drives with AC drives with frequency regulation of the centralized control center
Replacement of the furnace drive at Pellets Production Workshop (TsVO) 3rd technological line
Replacement of the Pellets Production Workshop (TsVO) furnace drive at 2nd technological line
Replacement of the Pellets Production Workshop 1 (TsVO-1) furnace drive at 1st technological line
Technical re-equipment of DZF belt conveyor drives No. 6
Technical re-equipment of DZF belt conveyor No. 2 drives
Technical re-equipment of DZF belt conveyor No. 7 drives
Technical re-equipment of the oil product analysis laboratory
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 