Power supply systems
Areas of implementation
Replacement of switchgear 0.4 kV of TS 03-1 BRM
More

Transformer replacement at TP 14-2
More

Transformer replacement at TP 15-2
More

Transformer replacement at TP 16-2
More

Modernization of 0.4 kV switchgear at PNS-1 TSHG
More

Installation of repair stations 220/380 V at OPU
More

Transformer replacement at TP 17-2
More

Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line
More

Reconstruction of TP-33-1
More

Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply
More

Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-200...
More

CSP. Implementation of special automatic load disconnection (SALD)
More

Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation...
More

Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the f...
More
