Replacement of switchgear 0.4 kV of TS 03-1 BRM
CLIENT
PJSC Poltava Mining
YEARS OF IMPLEMENTATION
2022
TYPE OF WORKS
Installation and commissioning
Equipment used, specifics of works provided
- The project included general construction works to improve the substation premises, including the installation of new cable entries, ventilation and heating systems, the arrangement of underground cable routes using horizontal directional drilling technology. Additionally, it involved a full range of dismantling and installation works for the main equipment, with cell retrofitting at the main stepdown substation, followed by the adjustment of the entire equipment complex.
Installation works
Commissioning works
Similar projects
CSP. Implementation of special automatic load disconnection (SALD)
Installation of repair stations 220/380 V at OPU
Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply
Modernization of 0.4 kV switchgear at PNS-1 TSHG
Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line
Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation...
Reconstruction of TP-33-1
Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-200...
Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the f...
Transformer replacement at TP 14-2
Transformer replacement at TP 15-2
Transformer replacement at TP 16-2
Transformer replacement at TP 17-2
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 