Reconstruction of TP-33-1
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2018
TYPE OF WORKS
Construction, electrical installation and commissioning works
Equipment used, specifics of works provided
- Works included the replacement of a two-transformer substation and a two-section 0.4 kV switchgear with automatic transfer switchboard, the construction part of which included finishing works on the premises, LED lighting, provision of a new automatic supply and exhaust ventilation and air conditioning system based on a liquid chiller and adjustable fan coils.
Installation works
Commissioning works
Similar projects
CSP. Implementation of special automatic load disconnection (SALD)
Installation of repair stations 220/380 V at OPU
Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply
Modernization of 0.4 kV switchgear at PNS-1 TSHG
Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line
Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation...
Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-200...
Replacement of switchgear 0.4 kV of TS 03-1 BRM
Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the f...
Transformer replacement at TP 14-2
Transformer replacement at TP 15-2
Transformer replacement at TP 16-2
Transformer replacement at TP 17-2
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us