Modernization of 0.4 kV switchgear at PNS-1 TSHG

CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2020
TYPE OF WORKS
Installation, commissioning, project adjustment

Equipment used, specifics of works provided

  1. The 2nd stage of the project was entrusted to our company’s specialists due to the successful implementation of the 1st stage.
  2. Replacement of switchgears of two input sections MCC1 and MCC2, construction of cable routes in place of existing routes in the conditions of existing production, laying of switchgear and reconnection of all 0.4 kV mechanisms and 6 kV pumps, switching to a new local control system, preparatory work for the transfer of the station to a remote control system from a centralized control system.

Design
Installation works
Commissioning works