Modernization of 0.4 kV switchgear at PNS-1 TSHG
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2020
TYPE OF WORKS
Installation, commissioning, project adjustment
Equipment used, specifics of works provided
- The 2nd stage of the project was entrusted to our company’s specialists due to the successful implementation of the 1st stage.
- Replacement of switchgears of two input sections MCC1 and MCC2, construction of cable routes in place of existing routes in the conditions of existing production, laying of switchgear and reconnection of all 0.4 kV mechanisms and 6 kV pumps, switching to a new local control system, preparatory work for the transfer of the station to a remote control system from a centralized control system.
Design
Installation works
Commissioning works
Similar projects
Installation of repair stations 220/380 V at OPU
CSP. Implementation of special automatic load disconnection (SALD)
Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply
Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line
Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation...
Reconstruction of TP-33-1
Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-200...
Replacement of switchgear 0.4 kV of TS 03-1 BRM
Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the f...
Transformer replacement at TP 14-2
Transformer replacement at TP 15-2
Transformer replacement at TP 16-2
Transformer replacement at TP 17-2