Transformer replacement at TP 16-2
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2020
TYPE OF WORKS
Design, installation, and commissioning
Equipment used, specifics of works provided
- According to our own design, we quickly and efficiently replaced the transformer and 0.4 kV busbar, 6 kV input cable, and performed commissioning works.
Design
Installation works
Commissioning works
Similar projects
Installation of repair stations 220/380 V at OPU
CSP. Implementation of special automatic load disconnection (SALD)
Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply
Modernization of 0.4 kV switchgear at PNS-1 TSHG
Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line
Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation...
Reconstruction of TP-33-1
Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-200...
Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the f...
Replacement of switchgear 0.4 kV of TS 03-1 BRM
Transformer replacement at TP 14-2
Transformer replacement at TP 15-2
Transformer replacement at TP 17-2
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us