Installation of repair stations 220/380 V at OPU
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2019
TYPE OF WORKS
Design, installation and commissioning
Equipment used, specifics of works provided
- In the framework of the project, an autonomous system of repair stations with safety and disconnection systems is envisaged to ensure unimpeded connection of the necessary repair equipment to the power grid.
Design
Installation works
Commissioning works
Similar projects
CSP. Implementation of special automatic load disconnection (SALD)
Modernization of 0.4 kV switchgear at PNS-1 TSHG
Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line
Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation...
Reconstruction of TP-33-1
Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-200...
Replacement of switchgear 0.4 kV of TS 03-1 BRM
Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the f...
Transformer replacement at TP 14-2
Transformer replacement at TP 15-2
Transformer replacement at TP 16-2
Transformer replacement at TP 17-2
Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us