Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation of a backup power line to supply individual power receivers of the Zinkivsk Central Regional Hospital
CLIENT
Municipal non-commercial enterprise "Zinkivskyi Central Regional Hospital"
YEARS OF IMPLEMENTATION
2017
TYPE OF WORKS
Design, installation, equipment supply, and commissioning
Equipment used, specifics of works provided
- An automatic transfer switch system with automatic start and stop of the diesel generator was implemented.
- A digital power quality analyzer Prova 6830a was used during the work.
Design
Installation works
Equipment supply
Commissioning works
Similar projects
CSP. Implementation of special automatic load disconnection (SALD)
Installation of repair stations 220/380 V at OPU
Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply
Modernization of 0.4 kV switchgear at PNS-1 TSHG
Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line
Reconstruction of TP-33-1
Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-200...
Replacement of switchgear 0.4 kV of TS 03-1 BRM
Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the f...
Transformer replacement at TP 14-2
Transformer replacement at TP 15-2
Transformer replacement at TP 16-2
Transformer replacement at TP 17-2