Project details

Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation of a backup power line to supply individual power receivers of the Zinkivsk Central Regional Hospital

CLIENT
Municipal non-commercial enterprise "Zinkivskyi Central Regional Hospital"
YEARS OF IMPLEMENTATION
2017
TYPE OF WORKS
Design, installation, equipment supply, and commissioning

Equipment used, specifics of works provided

  1. An automatic transfer switch system with automatic start and stop of the diesel generator was implemented.
  2. A digital power quality analyzer Prova 6830a was used during the work.

Design
Installation works
Equipment supply
Commissioning works