Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2019
TYPE OF WORKS
Installation and commissioning
Equipment used, specifics of works provided
- Ensuring uninterrupted power supply thanks to the implementation of the project with the introduction of UPS into the system in a short time.
Installation works
Commissioning works
Similar projects
CSP. Implementation of special automatic load disconnection (SALD)
Installation of repair stations 220/380 V at OPU
Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply
Modernization of 0.4 kV switchgear at PNS-1 TSHG
Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation...
Reconstruction of TP-33-1
Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-200...
Replacement of switchgear 0.4 kV of TS 03-1 BRM
Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the f...
Transformer replacement at TP 14-2
Transformer replacement at TP 15-2
Transformer replacement at TP 16-2
Transformer replacement at TP 17-2