CSP. Implementation of special automatic load disconnection (SALD)
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2017
TYPE OF WORKS
Installation and commissioning
Equipment used, specifics of works provided
- In the framework of the project, the installation and commissioning of the automatic load disconnection system based on the “Diamond” safety terminals at the feeder substation was carried out with the approval of NPC Ukrenergo.
Installation works
Commissioning works
Similar projects
Installation of repair stations 220/380 V at OPU
Modernization of 0.4 kV PNS-1 distribution devices. TSHH, temporary power supply
Modernization of 0.4 kV switchgear at PNS-1 TSHG
Modernization of the energy saving system at the Pellets Production Workshop (TsVO) ACS line
Overhaul of the existing SPP with the installation of a new 85 kVA diesel generator and installation...
Replacement of high-voltage input cells at fifteen different B-110 circuit breakers of the B-110-200...
Reconstruction of TP-33-1
Replacement of switchgear 0.4 kV of TS 03-1 BRM
Technical re-equipment of 0.4 kV electric supply boards. Board of the fecal pumping station of the f...
Transformer replacement at TP 14-2
Transformer replacement at TP 15-2
Transformer replacement at TP 16-2
Transformer replacement at TP 17-2
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us