Reconstruction of the electrical equipment of the CO-2 stacker at the Pellets Production Workshop (TsVO)

CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2018
TYPE OF WORKS
Installation and commissioning

Equipment used, specifics of works provided

  1. Scheduled repair and reconstruction of the port stacker with the replacement of the gearbox on the power and control drive cable reel (Power Cable reel) by WM UA Conductix Wampfler, installation and commissioning of the automatic operator control system, replacement of sensors and control devices, equipment with standard air conditioning.

Installation works
Commissioning works