Pellets Production Workshop (TsVO). Modernization of ACS TP of the 2nd technological line
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2019
TYPE OF WORKS
Installation and commissioning
Equipment used, specifics of works provided
- Complex work on the reconstruction of the entire second technological line of Pellets Production Workshop 1 (TsVO-1), which included the complete replacement of the MCC (motor control cabinets), with the replacement of power and control cables, replacement of cable structures of the cable floor, cable galleries of the combusting shop, cable routes of the pumping department, press filtration, etc.
- Installation, commissioning and launch of a new automatic remote-control system for electric drives of the mechanisms of the 2nd caster and all conveyor lines, replacement of safety and information sensors, laying of new optical communication lines and implementation of integrated automation solutions.
- The repair period for the 2nd production line was limited to 46 days.
- The following was installed: cable trays – 6474 m, pipes for cable networks – 8160 m, cables – 79019 m.
Installation works
Commissioning works
Similar projects
Blockage of dosing tracts (30003, 30013, 30005) at Pellets Production Workshop (TsVO)
Construction of a complex for filtration and storage of iron ore concentrate of the crushing and ben...
Crushing and processing plant (DZF). Construction of new SMD-1 tracts. Transfer of the ZF operator room
Crushing and processing plant (DZF). Reconstruction of blowers at the flotation site of OPU-4
Development of a working project for the replacement of stationary control posts (PU) No. 6, 8, 9 of...
Electrical installation work (sections EM, 3, 4 and ATX 1, 3, 4) during installation of the BENZLERS...
Installation of automatic transfer switches for drainage pumps of the 10th section of the DMP
Installation of screw conveyors (conveyor closers) at the 2nd technological line of the Centralized ...
Installation the lamps on columns along the crane routes of building 1 (Centralized Crane Shop)
Pellets Production Workshop. Construction of a new press filtration complex
Pellets Production Workshop. Construction of the filtering and averaging of concentrate No. 1 housin...
Reconstruction of the electrical equipment of the CO-2 stacker at the Pellets Production Workshop (T...
Relocation of the operator control room SDS-1 DOF
Replacement of DC drives with AC drives with frequency regulation of the centralized control center
Replacement of the furnace drive at Pellets Production Workshop (TsVO) 3rd technological line
Replacement of the Pellets Production Workshop (TsVO) furnace drive at 2nd technological line
Replacement of the Pellets Production Workshop 1 (TsVO-1) furnace drive at 1st technological line
Technical re-equipment of DZF belt conveyor drives No. 6
Technical re-equipment of DZF belt conveyor No. 2 drives
Technical re-equipment of DZF belt conveyor No. 7 drives
Technical re-equipment of the oil product analysis laboratory
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us