Reconstruction of the external power supply scheme for the “FERREXPO” enterprises under the condition of increasing the load to 500 and 770 kV
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2020—2021
TYPE OF WORKS
Design work. Energy calculations (power and electricity balances). Electrical calculations (calculations of electrical networks for normal, repair (post-accident) and repair-emergency modes). Calculations of short-circuit currents
Equipment used, specifics of works provided
- Electrical calculations and calculations of three-phase and single-phase short-circuit currents were performed in the DigSILENT Power Factory software package in accordance with the requirements of the IEC 60909 standard (DSTU IEC 60909-0:2007), DIgSILENT PowerFactory.
Design
Similar projects
Feasibility study of the facility “New construction of OHL 330 kV Dnistrovska PSPP – SS 750 kV...
New construction of the 330 kV Chernivtsi – Ternopilska overhead line with the reconstruction of the...
Refinement of calculations of modes and short-circuit currents regarding commissioning of the 66 MW ...
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 