New construction of the 330 kV Chernivtsi – Ternopilska overhead line with the reconstruction of the 330 kV Chernivtsi substation and the 330 kV Ternopilska substation. Ternopil and Chernivtsi regions
CLIENT
YEARS OF IMPLEMENTATION
2022
TYPE OF WORKS
Design work. Development of predicted power balances for typical operating modes (winter – maximum and minimum load, summer – maximum and minimum load). Calculations of short-circuit currents. Calculations of power flow distribution and voltage levels in the main power grids of the IPS of Ukraine in normal, repair (post-accident) and repair-emergency modes. Calculations of static and dynamic stability
Equipment used, specifics of works provided
- Electrical calculations and calculations of three-phase and single-phase short-circuit currents were performed in the DigSILENT Power Factory software package in accordance with the requirements of the IEC 60909 standard (DSTU IEC 60909-0:2007), DIgSILENT PowerFactory.
Design
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 