Technical re-equipment of the st. #. 1 excitation system G-1 TVV-320 (thermal power plant (TPP)
CLIENT
YEARS OF IMPLEMENTATION
2019—2022
TYPE OF WORKS
Design work, equipment supply. The implementation of the project has been suspended due to military operations on the territory of Ukraine
Equipment used, specifics of works provided
- Designing the replacement of the 320 MW TG excitation system with a static thyristor self-excitation system SVTG-3.2k/500-1 KS2T2.5-AR24-UHL4 (SPE “PREOBRAZOVATEL-KOMPLEX” LLC) with nonlinear damping resistors Metrosil FME/8000/600A/US12P/4PP/2SS, which works in conjunction with the Emerson Ovation ATS.
- Replacement of the unit’s RPA with ATS terminals (RET670, REG670 and others), replacement of the generator circuit breaker with a 20kV, 13.3 kA FKG1F (ALSTOM) circuit breaker with a 120 kA breaking capacity, replacement of the synchronizer with a SYNCHROTACT 6 SYN6201 ATS, complex automation, inspection of building structures, architectural and construction part (strengthening of supporting structures for installation of power transformer TSZP-4130/20-U3 (PE “ELTIZ”) weighing 11.6 tons. ), heating and ventilation (use of precision air conditioners to cool down the transformer room).
- Within the framework of the project, dynamic stability calculations were implemented in accordance with the requirements of SOU-N IEC 40.1-00100227-68 2012 “Power System Sustainability. Guidelines” (models of the ST4C thyristor self-excitation regulator and the PSS2B system stabilizer in accordance with the requirements of IEEE 421.5 Recommended Practice for Excitation System Models for Power System Stability Studies)
Design
Equipment supply
Similar projects
Complete preventive inspection, restorative maintenance (K(V)), and testing of the ССТП-3500-465-2,5...
Construction, installation, and commissioning works for the reconstruction of the first power unit w...
Development of an independent thyristor excitation system SNVTG-600-200-1.6-UHL4 for the project ...
Modernization of st. #1 turbogenerator. Replacement of the electromagnetic exciter with a thyristor ...
Reconstruction of power unit No. 7 with a capacity of 800 MW. Reconstruction of the control system t...
Reconstruction of the excitation system of a 25 MW turbine generator (replacement of the VT-120-3000...
Replacement of the electromagnetic exciter of the turbine generator TV-60-2 and ARZ type POA with a ...
Replacement of the existing single-channel thyristor self-excitation system type STS-300-2000-2,5-UH...
Supply of thyristor self-excitation systems for hydrogenerators of SSGG-1250-460-2UHL4 type
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 

