Technical re-equipment of the raw water supply scheme to the ultrafiltration unit (UFU) of the chemical department at the CHP plant
CLIENT
CHP
YEARS OF IMPLEMENTATION
2016—2017
TYPE OF WORKS
Design, equipment supply, installation, software development, commissioning
Equipment used, specifics of works provided
- NK GRUNDFOS 37 kW pumps, LDM control valves RV212 DN400, pressure, flow, temperature and level sensors, heating of process pipelines.
Design
Equipment supply
Installation works
Software development
Commissioning works
Similar projects
Construction of a water treatment plant at PJSC “POEZ-KERNEL GROUP” for the project impl...
Dismantling and installation, manufacturing and installation of metal structures, construction works...
Implementation of the adjustable electric drive of the Coastal Pumping Station NDV at the CHP plant
Installation and commissioning of a set of equipment for water purification by reverse osmosis techn...
Installation of three water purification systems at the Customer’s divisions, the Central Plan...
Reconstruction of measuring sections for drinking water pipelines 3 and 4 threads
Reconstruction of the water treatment scheme
Technical re-equipment of the wastewater treatment unit by applying the complex technology of membra...