SVL. Reconstruction of the steam supply at the diesel locomotive equipment department
CLIENT
PJSC "Poltava GZK"
YEARS OF IMPLEMENTATION
2017
TYPE OF WORKS
Installation and commissioning works
Equipment used, specifics of works provided
- Implementation of a project with the installation of an aqua distiller and an automatic control system to provide the locomotive equipment area with distilled water and water heating in the household premises with the implementation of repair and construction works, installation of an automation system.
Installation works
Commissioning works
Similar projects
Electronic control equipment and instrumentation. Replacing steam water heaters with electric ones
Modernization of automatic regulation and control of the of the water level control system for boile...
Reconstruction of the 16 ATA steam supply scheme
Reconstruction of the steam supply system of the diesel locomotive equipment section of the railway ...
Technical re-equipment of the system of automatic regulation (SAR) for the temperature of superheate...
Works on schemes development, maintenance, current repair and commissioning of PMU, PSU, KTP at the ...
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us