Setting-up an automatic frequency control station for electric motors of network pumps with the installation of an automatic reserve input cabinet at boiler houses at 193-a Mira Avenue and 151-a Mira Avenue, Chernihiv
CLIENT
YEARS OF IMPLEMENTATION
2022
TYPE OF WORKS
Installation and commissioning
Equipment used, specifics of works provided
- The control cabinet contains a KINCO-K532 programmable logic controller (PLC) kit and a KINCO GL100E touch panel (10.1″ 16770K color TFT 1024*600 high resolution) for displaying operating modes and viewing the event log.
- The frequency converter cabinets are based on Control Techniques NE300 series frequency converters: NE300-4T0550G/0750P (55/75 kW 380B-440B) or NE300-4T0750G/0900P (75/90 kW 380B-440B).
- To ensure electromagnetic compatibility with the grid and reduce current consumption fluctuations, Lenze three-phase EZAELN 75kW or 90kW line chokes are used at the FC input.
- The FC input circuits are protected by an NSX160N 150A circuit breaker (CB) with a MICROLOGIC 2.2M high-speed electronic disconnector.
- Bypass circuits are provided in the FC to enable direct start of the induction motors (IM) of the IA.
- The motor protection is carried out using EASYPACT EZC250N 3P3T 25kA 160A and thermal relay.
- A multifunctional 3-phase power control relay is used to control the order of supply voltage phases alternation.
Installation works
Commissioning works
Similar projects
Adjustable micropower drive for coal hoisting machine MPB 5x2x2
Adjustment of project documentation “DZF. Automatic pump control system 8NDV”
Automation of drying at 1, 3, 4 process lines at Centralized processing plant
Automation of the combustion safety system at the Centralized Processing Plant furnace unit No. 5 of...
CHP plant reconstruction with the conversion of boiler units No. 6, No. 7, No. 8 to burn non-designe...
Commissioning of five distribution devices for connecting frequency converters, including parameteri...
Construction of a water treatment plant at PJSC “POEZ-KERNEL GROUP” for the project impl...
Design and commisioning of the control and safety system for the GM-3 hydraulic unit
Emergencies early detection and people notification, in case of emergencies occurrence, system at th...
Implementation of the Coastal Pumping Station (CPS) NDV adjustable electric drive system at the CHP ...
Installation and commissioning of a set of equipment for water purification by reverse osmosis techn...
Modernization and development of electric drives and CNC control systems for metal-cutting and other...
Modernization of the automatic water level in boiler drums No. 1-4 regulation and control system
Modernization of the DZF unified control room
Modernization of the sewage pumping stations SPS-4 and SPS-7
Monitoring of the current load of the mill ball drive electric drives at mill No. 21115, inv. No. 12...
Oxygen and natural gas metering at the BRM based on Ergomera equipment
Reconstruction (technical upgrading) of the control and management system for the turbo-generator
Reconstruction and automation of section No. 12, DSP
Reconstruction of the 16 ATA steam supply scheme
Reconstruction of the CHP plant with the conversion of boiler unit No. 9 to burn non-project fuel (g...
Setting up control systems and a dispatching system for autonomous boiler houses (11 units) in Chern...
Technical re-equipment of the automated control system for pumping units (ACS PU)
Technical re-equipment of the automatic control system (ACS) for the superheated steam temperature c...
Technical re-equipment of the raw water supply scheme for the ultrafiltration unit (UFU) at the CHP ...
Technical re-equipment of the wastewater treatment unit by applying the complex technology of membra...
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 