Replacement of the existing single-channel thyristor self-excitation system type STS-300-2000-2,5-UHL4 TG-3 with a microprocessor controlled two-channel excitation system type SSTE-2000-300-2,5-UHL4
CLIENT
LLC Firm “Tech-Nova”
YEARS OF IMPLEMENTATION
2017—2018
TYPE OF WORKS
Design, installation works, equipment supply, software development, complex tests and commissioning works
Equipment used, specifics of works provided
- The excitation system STS-300-2000-2,5-UHL4 is a Ukrainian development (RE LLC “PREOBRAZOVATELNAYA TEHNIKA”).
- The system implements HMI Weintek based AWP.
- Climatization of the room with the equipment of the excitation system was carried out by column air conditioner MIDEA MFM-48.
- As part of complex tests and commissioning, thermal imaging surveys of power thyristor sections were carried out.
Design
Installation works
Equipment supply
Software development
Complex tests
Commissioning works
Similar projects
Complete preventive inspection, restorative maintenance (K(V)), and testing of the ССТП-3500-465-2,5...
Construction, installation, and commissioning works for the reconstruction of the first power unit w...
Development of an independent thyristor excitation system SNVTG-600-200-1.6-UHL4 for the project ...
Modernization of st. #1 turbogenerator. Replacement of the electromagnetic exciter with a thyristor ...
Reconstruction of power unit No. 7 with a capacity of 800 MW. Reconstruction of the control system t...
Reconstruction of the excitation system of a 25 MW turbine generator (replacement of the VT-120-3000...
Replacement of the electromagnetic exciter of the turbine generator TV-60-2 and ARZ type POA with a ...
Supply of thyristor self-excitation systems for hydrogenerators of SSGG-1250-460-2UHL4 type
Technical re-equipment of the st. #. 1 excitation system G-1 TVV-320 (thermal power plant (TPP)
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 