Reconstruction of the water treatment scheme
CLIENT
CHP
YEARS OF IMPLEMENTATION
2016—2020
TYPE OF WORKS
Correction of project documentation, equipment supply, installation work, software development, commissioning
Equipment used, specifics of works provided
- Construction and installation works:
– dismantling/installation of water storage tanks V=250 m2;
– application of anti-corrosion coating;
– installation of insulation;
– piping of the equipment. - Pumping equipment Installation (Grundfoss).
- A spectral analyzer of oil products, RTZO (current distribution gate equipment) cabinets, pump control cabinets based on Schneider Electric equipment.
Design
-
Equipment supply
-
Installation works
-
Software development
-
Commissioning works
Similar projects
Construction of a water treatment plant at PJSC “POEZ-KERNEL GROUP” for the project impl...
Dismantling and installation, manufacturing and installation of metal structures, construction works...
Implementation of the adjustable electric drive of the Coastal Pumping Station NDV at the CHP plant
Installation and commissioning of a set of equipment for water purification by reverse osmosis techn...
Installation of three water purification systems at the Customer’s divisions, the Central Plan...
Reconstruction of measuring sections for drinking water pipelines 3 and 4 threads
Technical re-equipment of the raw water supply scheme to the ultrafiltration unit (UFU) of the chemi...
Technical re-equipment of the wastewater treatment unit by applying the complex technology of membra...
Got questions?