Project details

Reconstruction of the water treatment scheme

CLIENT
CHP
YEARS OF IMPLEMENTATION
2016—2020
TYPE OF WORKS
Correction of project documentation, equipment supply, installation work, software development, commissioning

Equipment used, specifics of works provided

  1. Construction and installation works:
    – dismantling/installation of water storage tanks V=250 m2;
    – application of anti-corrosion coating;
    – installation of insulation;
    – piping of the equipment.
  2. Pumping equipment Installation (Grundfoss).
  3. A spectral analyzer of oil products, RTZO (current distribution gate equipment) cabinets, pump control cabinets based on Schneider Electric equipment.

Design
-
Equipment supply
-
Installation works
-
Software development
-
Commissioning works