Reconstruction of the 16 ATA steam supply scheme
CLIENT
CHP
YEARS OF IMPLEMENTATION
2018—2020
TYPE OF WORKS
Design, installation, equipment supply, software development, comprehensive testing and commissioning
Equipment used, specifics of works provided
Construction and installation works:
- dismantling of existing equipment;
- installation of new steam pipelines P=16 ATA, T=3000C, category III, f530-f325 with subsequent NMC;
- installation of LDM control valves;
- installation of thermal insulation.
Design
Installation works
Equipment supply
Software development
Complex tests
Commissioning works
Similar projects
Electronic control equipment and instrumentation. Replacing steam water heaters with electric ones
Modernization of automatic regulation and control of the of the water level control system for boile...
Reconstruction of the steam supply system of the diesel locomotive equipment section of the railway ...
SVL. Reconstruction of the steam supply at the diesel locomotive equipment department
Technical re-equipment of the system of automatic regulation (SAR) for the temperature of superheate...
Works on schemes development, maintenance, current repair and commissioning of PMU, PSU, KTP at the ...
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us