Reconstruction of power unit No. 7 with a capacity of 800 MW. Reconstruction of the control system to bring it in line with ENTSO-E requirements (reconstruction of the generator excitation system)
CLIENT
YEARS OF IMPLEMENTATION
2019—2022
TYPE OF WORKS
Project work
Equipment used, specifics of works provided
- Design work and selection of equipment for the most powerful thermal generation machine in Ukraine, 800 MW.
- In 2022, it was planned to test the operation of the power part of the excitation system with Emerson Ovation relay protection.
- The project was suspended due to military operations on the territory of Ukraine.
Design
Similar projects
Complete preventive inspection, restorative maintenance (K(V)), and testing of the ССТП-3500-465-2,5...
Construction, installation, and commissioning works for the reconstruction of the first power unit w...
Development of an independent thyristor excitation system SNVTG-600-200-1.6-UHL4 for the project ...
Modernization of st. #1 turbogenerator. Replacement of the electromagnetic exciter with a thyristor ...
Reconstruction of the excitation system of a 25 MW turbine generator (replacement of the VT-120-3000...
Replacement of the electromagnetic exciter of the turbine generator TV-60-2 and ARZ type POA with a ...
Replacement of the existing single-channel thyristor self-excitation system type STS-300-2000-2,5-UH...
Supply of thyristor self-excitation systems for hydrogenerators of SSGG-1250-460-2UHL4 type
Technical re-equipment of the st. #. 1 excitation system G-1 TVV-320 (thermal power plant (TPP)
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 