Project details

Modernization of st. #1 turbogenerator. Replacement of the electromagnetic exciter with a thyristor excitation system

CLIENT
CHPP
YEARS OF IMPLEMENTATION
2016—2018
TYPE OF WORKS
Modification of the design and estimate documentation, installation work, equipment supply, commissioning works

Equipment used, specifics of works provided

  1. Project development.
  2. Installation.
  3. Complex tests and commissioning of the excitation system based on a power transformer type TSZP-1250/6-U3 6.3/665V (PE “ELTIZ”) and thyristor excitation system type SVTG-1,3k/350-1ES2T2,5-UHL4 (LLC “RDE “PREOBRAZOVATEL-COMPLEX”).

Modification of the design and estimate documentation
Installation works
Equipment supply
Commissioning works