Installation of three water purification systems at the Customer’s divisions, the Central Plant, the DMP, and the Pellets Production Workshop (TsVO)
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2021
TYPE OF WORKS
Installation and commissioning
Equipment used, specifics of works provided
- Within the framework of the projects, it was installed water purification systems using reverse osmosis technology, automation and protection systems for pumping units has been installed.
Installation works
Commissioning works
Similar projects
Construction of a water treatment plant at PJSC “POEZ-KERNEL GROUP” for the project impl...
Dismantling and installation, manufacturing and installation of metal structures, construction works...
Installation and commissioning of a set of equipment for water purification by reverse osmosis techn...
Reconstruction of measuring sections for drinking water pipelines 3 and 4 threads
Reconstruction of the water treatment scheme
Technical re-equipment of the raw water supply scheme to the ultrafiltration unit (UFU) of the chemi...
Technical re-equipment of the wastewater treatment unit by applying the complex technology of membra...
Implementation of the adjustable electric drive of the Coastal Pumping Station NDV at the CHP plant
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us