Installation and commissioning of a set of equipment for water purification by reverse osmosis technology with a capacity of at least 16.6 m³/h at the facility “New construction of buildings and structures complex for grain storage and processing”
CLIENT
ENSELCO-AGRO LLC
YEARS OF IMPLEMENTATION
2020—2021
TYPE OF WORKS
Installation and commissioning works
Equipment used, specifics of works provided
Installation and commissioning of the following equipment:
- PE tank 10 m2; AZUD disk filter with flushing control controller;
- mechanical cleaning filter ECOSOFT FP3072;
- two-stage reverse osmosis desalination plant ECOSOFT MO;
- ECOSOFT CIP membrane chemical washing station;
- GRUNDFOS reagent dosing station complete with reagent tank and level sensor;
- GRUNDFOS pumps;
- flow meters E+H Prowil and a set of control devices; pipeline (PVC).
Installation works
Commissioning works
Similar projects
Construction of a water treatment plant at PJSC “POEZ-KERNEL GROUP” for the project impl...
Dismantling and installation, manufacturing and installation of metal structures, construction works...
Implementation of the adjustable electric drive of the Coastal Pumping Station NDV at the CHP plant
Installation of three water purification systems at the Customer’s divisions, the Central Plan...
Reconstruction of measuring sections for drinking water pipelines 3 and 4 threads
Technical re-equipment of the raw water supply scheme to the ultrafiltration unit (UFU) of the chemi...
Reconstruction of the water treatment scheme
Technical re-equipment of the wastewater treatment unit by applying the complex technology of membra...