Implementation of the adjustable electric drive of the Coastal Pumping Station NDV at the CHP plant
CLIENT
YEARS OF IMPLEMENTATION
2019
TYPE OF WORKS
Adjustment of design and estimate documentation, installation works, software development, equipment supply, commissioning
Equipment used, specifics of works provided
- TIS shut-off valves, ABO underwater shut-off valves, Grundfos pumps, Schneider Electric IF and PLC, Lapp Kabel cable products.
- Adjustment of project and estimate documentation and proposal of alternative technical solutions allowed the customer to save more than 20% of capital costs, namely 6.5 million hryvnias including VAT.
- During the installation work, underwater welding and industrial climbing work were carried out.
Design
Installation works
Software development
Equipment supply
Commissioning works
Similar projects
Construction of a water treatment plant at PJSC “POEZ-KERNEL GROUP” for the project impl...
Dismantling and installation, manufacturing and installation of metal structures, construction works...
Installation and commissioning of a set of equipment for water purification by reverse osmosis techn...
Installation of three water purification systems at the Customer’s divisions, the Central Plan...
Reconstruction of measuring sections for drinking water pipelines 3 and 4 threads
Reconstruction of the water treatment scheme
Technical re-equipment of the raw water supply scheme to the ultrafiltration unit (UFU) of the chemi...
Technical re-equipment of the wastewater treatment unit by applying the complex technology of membra...
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 