Project details

Design and commisioning of the control and safety system for the GM-3 hydraulic unit

CLIENT
Tashlyk Pumped Storage Power Plant (Tashlyk PSPP)
YEARS OF IMPLEMENTATION
2022
TYPE OF WORKS
Design, comprehensive commissioning and testing

Equipment used, specifics of works provided

  1. OVATION software and hardware complex, ELEKTROTECHNIKA transformer and excitation system, and SIEMENS duplicate synchronizers.
  2. The design and commissioning took into account the specifics of different equipment manufacturers, and ensured the docking and interface of these systems.
  3. Tests were conducted at different power levels, both in generator and pumping modes.

 

Design
Commissioning works
Complex tests