Project details

Construction of a water treatment plant at PJSC “POEZ-KERNEL GROUP” for the project implementation: “Reconstruction of the plant’s steam supply system with the installation of a cogeneration unit with an electric capacity of 10.4 MW

CLIENT
PJSC "POEZ-KERNEL GROUP", address: 17 Marshala Biryuzova St., Poltava
YEARS OF IMPLEMENTATION
2021—2022
TYPE OF WORKS
Installation, commissioning, project adjustment

Equipment used, specifics of works provided

  1. Implementation of the automatic control system for the water treatment plant, including measuring and control equipment based on modern hardware and software without the presence of personnel.
  2. Development and implementation of the software complex “automated workstation of the water treatment plant operator (SCADA)”, with equipment monitoring and control in the control room of the thermal power plant and the water treatment plant machine room.

Design
Installation works
Commissioning works