Construction, installation, and commissioning works for the reconstruction of the first power unit with the complete replacement of the TG-1, type ТВФ-125-2У3 turbine generator, at the CHPP

CLIENT
CHPP
YEARS OF IMPLEMENTATION
2015—2016
TYPE OF WORKS
Construction, installation, and commissioning works for the reconstruction of the first power unit, complete replacement of the TG-1, type ТВФ-125-2У3 turbine generator. Comprehensive testing according to the commissioning work programs

Equipment used, specifics of works provided

  1. Installation of the STS-2E excitation system.
  2. Installation and commissioning of the complete shielded busduct from the TG-1 turbine generator to the AREVA circuit breaker.
  3. Installation and commissioning of instrumentation and control equipment: pressure gauges, pressure sensors, ultrasonic level controllers (ULC), resistance temperature detectors (RTD).
  4. Installation and commissioning of the following: hydrogen gas analyzer cabinets G1 and G2, control cabinets for technological equipment ШУС-1 and ШУАН-01.
  5. Supply, installation, and commissioning of cabinets ШТН, ШТТ, УЗР-1И, РТЗО-88, ШАРЗ, ШЕ1110M (A and B), ШЕ1111 АУВ, ШСА and ШСБ.
  6. Installation and commissioning of technological equipment: shaft seal oil pumps, gas cooling pumps, centrifugal fans ЕВ.
  7. Commissioning of the existing relay protection and automation (RPA).
  8. Installation of the Emerson’s “Ovation” software and hardware based technological monitoring system for the turbine generator.

Installation works
Commissioning works
Comprehensive testing