Automation of the combustion safety system at the Centralized Processing Plant furnace unit No. 5 of the grinding body of the batch preparation section (automated process control system, combustion safety system), Mill path No. 5
CLIENT
Ferrexpo Poltava Mining
YEARS OF IMPLEMENTATION
2015
TYPE OF WORKS
Installation works, software development for PLC Mitsubishi Electric Melsec System Q, HMI and SCADA commissioning work
Equipment used, specifics of works provided
- Installation of compressed air flow, pressure, and vacuum sensors manufactured by Yokogawa, Jumo, pneumatic control valves manufactured by InterApp, throttles manufactured by Beck, normally closed gas supply shut-off valves, ASCO purge valves, Maxon gas shut-off valve, igniters manufactured by Forney, igniter and burner flame control devices manufactured by Fireye, Raytek temperature measurement pyrometer in the furnace unit, Rosemount radar level gauges.
- Use of SCADA Citect and high-performance Mitsubishi MELSEC-Q series PLCs.
Installation works
Software development
Commissioning works
Similar projects
Adjustable micropower drive for coal hoisting machine MPB 5x2x2
Adjustment of project documentation “DZF. Automatic pump control system 8NDV”
Automation of drying at 1, 3, 4 process lines at Centralized processing plant
CHP plant reconstruction with the conversion of boiler units No. 6, No. 7, No. 8 to burn non-designe...
Commissioning of five distribution devices for connecting frequency converters, including parameteri...
Construction of a water treatment plant at PJSC “POEZ-KERNEL GROUP” for the project impl...
Design and commisioning of the control and safety system for the GM-3 hydraulic unit
Emergencies early detection and people notification, in case of emergencies occurrence, system at th...
Implementation of the Coastal Pumping Station (CPS) NDV adjustable electric drive system at the CHP ...
Installation and commissioning of a set of equipment for water purification by reverse osmosis techn...
Modernization and development of electric drives and CNC control systems for metal-cutting and other...
Modernization of the automatic water level in boiler drums No. 1-4 regulation and control system
Modernization of the DZF unified control room
Modernization of the sewage pumping stations SPS-4 and SPS-7
Monitoring of the current load of the mill ball drive electric drives at mill No. 21115, inv. No. 12...
Oxygen and natural gas metering at the BRM based on Ergomera equipment
Reconstruction (technical upgrading) of the control and management system for the turbo-generator
Reconstruction and automation of section No. 12, DSP
Reconstruction of the CHP plant with the conversion of boiler unit No. 9 to burn non-project fuel (g...
Reconstruction of the 16 ATA steam supply scheme
Setting up control systems and a dispatching system for autonomous boiler houses (11 units) in Chern...
Setting-up an automatic frequency control station for electric motors of network pumps with the inst...
Technical re-equipment of the automated control system for pumping units (ACS PU)
Technical re-equipment of the automatic control system (ACS) for the superheated steam temperature c...
Technical re-equipment of the raw water supply scheme for the ultrafiltration unit (UFU) at the CHP ...
Technical re-equipment of the wastewater treatment unit by applying the complex technology of membra...
Got questions?
Want to know more about our products or services? Please, fill in the form, and our Customer Relations Manager will contact you as soon as possible!
Message us 